Directives
December 16 - 2025 Employee and Contractor Parking Rates Increase
December 13 - Ground Operations Manual (GOM), Version 3.6
December 12 - Updated Restriction to Operational & Non-Operational Aircraft Parking
November 22 - Forgotten Baggage Retrieval Process
November 15 - Inbound Firearms Delivery Directly to CBSA Secondary
October 16 - Changes To GSE, Ground Support Equipment Hitch Styles for use in Ground Handling Operations
September 11 - Airport Traffic Directives - Changes to Requirements and Administration 2024
June 27 - Ground Operations Manual (GOM), Version 3.5
June 11 - Parking of Vehicles, ULDs and Ground Service Equipment (GSE) & Notice of Enforcement Measures
June 7 - Airport Traffic Directives Updated 2024 version
June 3 - Proper Disposal of Oil/Hydraulic Cans/Containers
May 31 - Night Flight Restriction Program
March 28 - Freight Elevator training and utilization at Toronto Pearson
March 1 - Engine Fan Blade Ice Shedding Run Ups and Single Engine Taxi
February 16 - Restriction to Operational & Non-Operational Aircraft Parking
February 15 - Enforcement Actions for Non-Compliance with the Pearson Standard
December 20 - Ground Operations Manual (GOM), Version 3.4
December 8 - Securing PLC /OT/ICS Panels
November 30 - Air Carrier Security Training: Terminal Swing Gate Operation
November 10 - Security Breaches In the Transborder Designated Area
November 1 - Engine Fan Blade Ice Shedding Run Ups and Single Engine Taxi
October 24 - Airport Collaborative Decision Making (A-CDM): Introduction of Push at Target Start-Up Approval Time (TSAT)
July 5 - Ground Operations Manual (GOM), Version 3.3
June 8 - Airside Vehicle Operating Permit (AVOP) - DA Practical Tests
May 8 - Misuse of passenger baggage carts by airport staff and contractors
May 5 - Airfield Maneuvering Area Transponder (MLAT) Requirement
April 26 - Annual Update of Airport Emergency Plans
April 21 – Storage of Commodities in Service Rooms and Means of Egress, in breach of the National Fire Code
March 22 – Airport Traffic Directives Updated 2023 version
March 9 – BHS - Engineering PLC Change Management Process
March 2 – Sterility Breaches in the Transborder Designated Area (CB03-02-23)
February 28 – Screening of US bound non-Passengers
January 30 – Airline Passenger Load Reporting Requirement
October 25 – Street Licensed Vehicles Operating Airside
September 27 – Clarification to Safety Personal Protective Equipment (PPE) Working Airside Advisory
May 19 – Ground Operations Manual (GOM), Version 3.1
April 7 – Annual Update of Airport Emergency Plans
March 29 – Unit Load Device (ULD) Inventory Control
March 7 – Restriction to Operational & Non-Operational Aircraft Parking
February 15 – AVOP Renewal Process and Training Hour Requirements
December 23 – New AVOP Fee Schedule and Written Exam Booking Process
December 17 – Ground Operations Manual, Version 3.0 Update
October 27 – Night Flight Restriction Program - Winter 2021 and Summer 2022
October 21 – Engine Fan Blade Ice Shedding Run Ups and Single Engine Taxi
July 14 – AVOP Renewal Process
June 1 – AVOP Written Test Location and Renewal Process – Amendment
April 23 – Workplace Face Covering Requirements – Amendments made to Expected Action
April 21 – Face Covering Requirements in Baggage Laterals and Airside
April 21 – Reopening Runway 06R/24L
December 22 – Provision of Assistance to Persons with Disabilities at Toronto Pearson Airport Due to New Regulations
December 16 – T1 Inbound Baggage Roadway U-Turns
December 1 – Engine Fan Blade Ice Shedding Run Ups and Single Engine Taxi
November 10 – Mandatory Workplace Contact Tracing for Airport Employers
October 30 – Temporary Closure of Runway 06R/24L and associated Taxiways
October 28 – Restriction on Non-Operational Aircraft Parking during Winter 2020/2021
September 29 – Updated: New Face Covering Requirements
August 31 – New Face Covering Requirements
August 24 – Mandatory Health Check Screening for Airport Employees
June 16 – Airline Passenger Load Reporting Requirement
May 27 – Mandatory Face Coverings (defined below) and Airport Access Restrictions
May 26 – Airport Emergency Plan (AEP) and Communicable Disease Plan
May 8 – New Mandatory Face Covering Requirements at Non-Passenger Screening Points
April 18 – Mandatory Face Covering Requirements at Non-Passenger Screening
March 21 – Temporary Parking of Overflow Aircraft (COVID-19)
December 16 – Ground Operations Manual, Version 2.0 Update
November 25 – New Safety Restrictions on the use of the C27 Underpass at Terminal 3
October 23 – Night Flight Restriction Program – Winter 2019-Summer 2020
October 17 – Aircraft DeAnti-icing TPIA Specific Procedures
October 3 – Permanent Closure of Emergency Standby Area Vehicle Gate 303 (V303)
September 5 – General/Business Aviation–Airport Reservation Office Reservation Procedures and Compliance
August 27 – Airport Collaborative Decision Making (A-CDM) Trials
August 20 – Mandatory use of the new Advanced Visual Docking Guidance System (A-VDGS) on all A-VDGS equipped Stands
June 13 – New Advanced Visual Docking Guidance System (A-VDGS)
June 6 – Night Flight Restriction Program – June 6 to October 26
November 30 – Addendum to Ground Operations Manual Section D.6.18 – Addition of Run-Up Location #2
November 19 – Addendum to Airport Traffic Directives – D AVOP Testing Requirements, AVOP Suspensions Timelines, and Illegal Drugs
November 5 – ENGINE FAN BLADE ICE SHEDDING RUN UPS AND SINGLE ENGINE TAXI
June 8 – Air Carriers Assisting Passengers who are blind travelling through Toronto Pearson
February 28 – NEW Airport Emergency Plan (AEP)
Advisories
May 1 - Terminal 1 – Gate 161, 163, 165, 167, 169 Electrical Shutdown
April 30 - REVISED DATES: Terminal 1 and Terminal 3 Oversized CATSA X-Ray Machine
April 23 - Terminal 1 and Terminal 3 Oversized CATSA X-Ray Machines
April 17 - Remotely Piloted Aircraft Operation – National Geographic Filming
April 17 - Parking Garage Cleaning Schedule – April to October 2025
April 17 - Elevator Shutdown at Value Park Garage
April 15 - Subject Use of Airport Security Doors
April 8 - IFC Centralized Waste Disposal Location Trial
March 27 - Baggage Carousel 7 Terminal 3 International Arrivals
March 14 - Elevator Shutdown at Value Park Garage
March 10 - Terminal 3 Centralized Waste Bin Location Trial
February 10 - Non-Passenger Screening-Vehicle North- Temporary Relocation of Screening
February 7 - Subject Access to Transborder/Preclearance Areas in Terminal 1 and 3
January 30 - Infield Concourse (IFC) – HVAC Unit Replacement
January 27 - T3 Bridge – Arrivals Lane Closure
January 17 - Futureproof Your Fleet Workshop at GTAA Admin Building Extra Parking
January 10 - HHF PODs HVAC Replacement
January 8 - Terminal 3 West Loading Temporary Dock Closure
December 13 - Silver Dart & Airport Rd / T1 Service Level Maintenance Activities
December 6 - Terminal 3 Stress Test for Enhanced Non-Passenger Screening
December 4 - Common Use Chocks & Cones Trial T1/T3
November 28 - Garbage Compactor trial at the H gates
November 15 - Automated People Mover (APM) Train Service Disruption
November 15 - Employee Parking Management Software Upgrade
November 15 - Terminal 1 – Pedestrian Bridge HVAC Replacement
November 14 - Terminal 1 Pier C Roll-up Doors Replacement
November 8 - Terminal 3 Pier C Roll-up Doors Replacement
November 6 - Goods for Passenger Consumption Must Use Logistics Program Process
November 6 - Elimination of Single-Entry Codes in Terminal 1, Terminal 3 and Infield Concourse (IFC)
October 31 - Terminal 1 Stand 181 Bus Lane Addition
October 31 - Terminal 1 – Departures Level 5 Parking Garage Entrance
October 31 - Automated People Mover (APM) Train Disruption Disruption
October 30 - Stand B10B Elevated Stop Sign Placement / Paint Marking **RETURN TO PREVIOUS**
October 22 - Stand B10B Elevated Stop Sign Placement / Paint Marking
October 21 - Common Handler License Change
October 11 - Terminal 1 – Electric GSE Charger Installation (eGSE)
October 1 - C26 Inbound Baggage Staging Area for Airline Baggage Inductions Second Trial
September 24 - Service to Passengers with Service Animals
September 20 - Terminal 3 Pier C Roll-up Doors Replacement
September 16 - T1 & T3 Apron Concrete Slab Replacement
September 16 - Return of Cargo West Non-Passenger Screening for Vehicles (NPSV)
September 9 - Automated People Mover (APM) Train Service Disruption
September 4 - New Hours of Operation for Employee Pass Office
August 30 - Need and Right to Enter and Remain in the Airport Restricted Area
August 26 - Terminal 1 Pier E Roll-up Doors Replacement
August 13 - T1 Stand 256 Modification and Reactivation
August 1 - Terminal 3 Stand Modifications - B10, B10A, B10B
August 1 - Infield Concourse (IFC) Reactivation
July 4 - Temporary Relocation of Cargo West Non-Passenger Screening for Vehicles (NPSV)
June 28 - C26 Inbound Baggage Staging Area for Airline Baggage Inductions Trial
June 27 - Terminal 1 Pier D Roll-up Doors Replacement
June 7 - Cancelled/Delayed Flights and Duty Free Protocol
June 3 - Automated People Mover (APM) One Train Service Disruption
May 29 - Automated People Mover (APM) Train Service Disruption
May 16 - Terminal 1 Hammerhead F Roll-up Door Replacement - Update
May 1 - Terminal 1 Stand 181 Bus Lane Addition
April 26 - Terminal 1 Hammerhead F Roll-up Door Replacement
April 25 - Infield Concourse – Terminal 1 Air Carrier Summer Operations
April 16 - Uninjured Passenger Centre Relocation
April 12 - Groundside Designated Smoking Areas
April 10 - Infield Tunnel, North and South Cell – Annual Fire Safety Inspections
April 9 - Permanent Modifications to the Critical Area that is Restricted (CRA)
April 3 - Reminder of Designated Routes and Ways to Access the Airport
April 2 - Total Solar Eclipse – April 8, 2024
March 21 - New Initiative for Passengers Requiring an Accessible Vehicle
March 20 - New Platform for Transportation Security Clearance Applications Update
March 19 - Upgrading The Employee Parking Key Card Access System
March 13 - Terminal 3 Pier C Domestic International Baggage Room Roll-up Door Closures
March 13 - Terminal 3 B7F Closure for Roof Replacement
March 12 - New Platform for Security Clearance Applications Postponed Update to Advisory # 2024-A-003
March 1 - Parking and Groundside Operations during March break
February 22 - Bombardier Facility and Taxiway Juliet Charlie Activation
February 20 - Automated People Mover (APM) One Train Service Disruption
February 20 - AVOP Written Exam Room Location Change / AVOP Suspension Pass Surrender Location
February 14 - New Online Platform for Transportation Security Clearance Applications
February 8 - Terminal 3 International Baggage Roadway Roll-up door closures
January 19 - Tub Holder Distribution for the T1 Inbound Baggage Claims Hall
December 18 - Emergency Road Repair – Silver Dart Drive Ramp to T1/T3 Inbound Ramp “Revised date”
December 14 - Emergency Road Repair – Silver Dart Drive Ramp to T1/T3 Inbound Ramp
December 14 - Terminal 3 HammerHead B SPIL – Facility Activation
December 7 - Terminal 1 - Washroom Revitalization Phase 1
December 5 - EBS Construction Holiday Schedule
November 22 - 2024 Employee and Contractor Parking Rates Increase
November 21 - Control Tower Working out of the Area Control Centre (ACC)
November 10 - Access to Transborder Preclearance Areas in Terminal 1 and 3
November 10 - Transborder Preclearance Area Sterility
November 10 - Temporary Expansion of the Critical area that is Restricted (CRA) Extension to Advisory 2023-A-036
November 1 - South Service Road Rehabilitation PIFFC Building to Gate V313A Revised
November 1 - Temporary Expansion of the Critical Area that is Restricted (CRA)
October 30 - South Service Road Rehabilitation (PIFFC Building to Gate V313A)
October 27 - Automated People Mover (APM) One Train Service Disruption
October 27 - Terminal 1 Cafeteria “Comfort Zone” Access to Service Corridor
October 23 - T1 Pier G West Redesign
October 19 - AVOP Card Issuance Returning to the GTAA Pass Office
October 18 - T3 Early Baggage Storage Construction – Pier C Impacts
October 16 - Automated People Mover (APM) Train Service Disruption
October 13 - Taxiway AM Access Road Closure
October 6 - T1 International Arrivals Passenger Exit From CBSA
October 4 - Automated People Mover (APM) One Train Service Disruption
September 26 - Taxiway AM Access Road Closure
September 6 - Automated People Mover (APM) Two Train Service Disruption
August 8 - Re-opening of The Employee Viscount Station South Lot (VSSL)
August 4 - AM Access Road Closure
June 26 - Changes to GTAA Pass Office Hours
June 26 - Changes to the Transportation Security Clearance Application
June 16 - Transborder/Preclearance Area Sterility
June 16 - Terminals Flooring Replacement 2023 - T1 Level 1 Node E Bus Bay
June 12 - AVOP Written Exam Room Location Change
June 2 - Terminal 3 Early Baggage Storage Construction
June 1 - Closure of T1 HBS Parking Area
May 19 - T1 Apron Concrete Slab Replacement – AL Apron Intersection
May 18 - Taxiway E Rehabilitation Impacting Infield Cargo
May 4 - Temporary Closure of the North Service Rd
May 3 - Lost and Found Returning Items at Lost and Found Office- Advisory
April 25 - Terminal 1 Stand 245A Modification
April 24 - AVOP Written Exam Room Location Change
April 18 - Terminal 1 Apron Lane 7/8 footprint construction & Infield Concourse - T1 Air Carrier Operations
April 13 - Terminal 1 Pier D Service Road Nightly Closures
April 5 - New Apron Taxilane Startboxes
March 17 - Non-Passenger Screening – Vehicles Cargo West Facility
February 7 – Terminal 3 Baggage Service Road Daily Closures
January 20 – Infield Concourse (IFC) Primary Security Line (PSL) Move
January 19 – Automated People Mover (APM) One Train Service Disruption
January 12 – Access to Transborder/Preclearance Areas in Terminal 1 and 3
January 5 – T3 Cladding Restoration – T3 West Loading Dock
December 8 - Data/GPS Connectivity Issues at the CVHA and Surrounding Airport Areas
November 30 - Enforcement Action to Directive #2022-D-008 Safety Personal Protective Equipment Working Airside
November 28 - Central Workshops Fuel Station Closure – Temporary Closure
November 21 - Employee Parking Rates Increase
November 18 - Terminals Flooring Replacement 2022 – T1 Service Level (Public side)
November 16 - Central Workshops Fuel Station – Temporary Closure
November 10 - Terminal 3 Cladding Project Laydown Area
November 7 - Automated People Mover APM One Train Service Disruption
October 28 - Mark’s Work Warehouse Promotion for Airport Community
October 28 - Name Changes – 06L/24R Holding Bays and Associated Taxi Lanes
October 27 - Non-Passenger Screening – Re-activation & Schedule Changes
October 27 - 409 Off-Ramp to Airport Rd. Temporary Closure
October 27 - Terminal 3 Roofing Project Laydown Area
October 26 - Automated People Mover (APM) Service Disruption
October 19 - Central Workshops Fuel Station – Temporary Closure
October 14 - Automated People Mover (APM) One Train Service Disruption
October 12 - Terminals Flooring Replacement 2022 – T1 Service Level (Back of House)
October 7 - Viscount Bridge & 409 On-Ramps Rehabilitation – Viscount Road Full Closure
October 3 - Reminder on Terminal 3 Duty-Free – Cash and Carry Protocol
September 28 - Masking Requirements Suspended for All Passengers and Employees
September 26 - Automated People Mover (APM) Service Disruption
September 9 - Safety Personal Protective Equipment (PPE) Working Airside
September 7 - Change to Pass Office Hours
September 7 - Viscount Bridge & 409 On-Ramps Rehabilitation – Viscount Road Full Closure
September 2 - Infield Concourse (IFC) Reactivation - Phase 2
August 31 - Terminal 3 Apron Slab Work
August 28 - IFC Resuming Operations – No Loitering Bus Bay 12
August 28 - Terminal 3 – HammerHead B SPIL – Apron & Terminal work
August 22 - Infield Concourse (IFC) Temporary Security Line Relocation
August 11 - Apron and Taxilane Modifications
August 9 - T1 Head of Stand Road Closure Abeam Stand 167
August 8 - Masking Requirements
August 8 - Non-Passenger Screening - Vehicles (NPSV) SE Re-Activation
August 5 – Taxiway Juliet at Taxiway Kilo Nightly Closure
July 25 – Masking Suspension for GTAA Workspaces
July 18 – Apron Stand H4 modifications and Vehicle Corridor Repositioning
July 18 – Four Month Extension of YYZ Transportation Security and Restricted Area Identity Cards
July 13 – Airside Restoration Project – Flagging operations around Gate 313
July 4 – AVOP Issuance
June 30 – Access to Transborder-Preclearance Areas in Terminal 1 and 3
June 25 – Update to Baggage Lateral and Carousel Displays
June 21 – Closure of North Service Road
June 17 – Infield Concourse (IFC) Reactivation for Summer 2022
June 17 – We’re opening our doors! As of June 20, 2022 Our Terminal is Opened to The Public
June 15 – Airport Mandatory Vaccination Policy to Be Suspended Effective June 20, 2022
June 8 – Parking Garage Rehabilitation – Main Entrance Reduction of Vehicle Lane Access
May 25 – Trending Non-Compliance for Restricted Area Access and Escort Requirements
May 20 – Terminal 3 Parking Garage Rehabilitation
May 3 – Reminder Transportation Security Clearance Renewal
April 29 – AMF, Administrative Building, and South Firehall Parking Lot Repaving
April 7 – Apron Entrance DR Intersection Closure
March 31 – Runway 06L 24R and Associated Taxiway Closure
March 28 – GTAA Lost & Found Office Change in Hours of Operation
March 24 – Earth Hour 2022 at Toronto Pearson
March 22 – Automated People Mover (APM) Link Train maintenance schedule
March 16 – Continued Health Measures
February 25 – Terminal 1 Pier D Service Road Nightly Closures
February 17 – GTAA Pass Permit Control Office (Pass Office) Open
February 8 – GTAA Pass Office and Virtual Queue Open
February 4 – Update: Pass Permit Control Office (Pass Office) System Changes
January 27 – Cancelled Flights and Duty Free Protocol
January 27 – Toronto Pearson Security Policy
January 24 – Changes at the GTAA Pass Permit Control Office
January 17 – Update regarding the GTAA Pass Permit Control Office Virtual Queueing System
December 20 – Baggage Handling System Baggage Weight- Size Restrictions-Revised
December 17 – GTAA Pass Permit Control Office Customer Service Update
December 16 – Baggage Handling System Baggage Weight- Size Restrictions
December 8 – Toronto Pearson - Working from Heights Awareness & Prevention
November 25 – Parking Reminder for Airport Employees
November 23 – Employee Parking Date Extension Ends November 30th
November 13 – Proof of vaccination exemption
October 28 – Government of Canada vaccination mandate comes into effect
October 22 – AVOP Written Exam Relocation Change
October 22 – Employee Parking Relocation to the Value Park Garage, date extended to November 30th
October 21 – Parking Structure Rooftops Terminal 1, Terminal 3, and Value Park Garage closed for Winter 2021-2022
October 20 – Deicing Services Program Documentation
October 14 – Closure of stair FDST03 in Terminal One Transborder Area
October 5 – AMF and Administrative Building Parking Lot Repaving
September 29 – Reactivation of Terminal 3 Pier A
September 28 – Employee Parking Relocation to the Value Park Garage date extended to October 31st
September 22 – Employee parking to resume in the Value Park Garage
September 20 – Proof of Vaccination Required at Certain Food and Beverage Locations
September 20 – Toronto Pearson Mandatory Vaccination Policy
September 7 – NPSV Infield Tunnel Reactivation
August 31 – T1 Ground Level Re-Allocation
August 27 – Automated People Mover (APM) Service Disruption
August 23 – Airside Vehicle Operations Permit (AVOP) Written Examinations
August 20 – Taxiway Bravo between Taxiway B1 and Taxiway B4 Closure
August 20 – PSL Fence Replacement by Gate 301 – Impact to T3 Loading Dock
August 19 – Closure of Taxiway C – Phases 4 and 5
August 12 – Global Reporting Format GRF
August 11 – PSL Fence Replacement by Gate 301 – Impact to T3 Loading Dock
August 6 – Closure of Taxiway Tango between Runway 15L 33R and Taxiway Alpha
August 5 – COVID-19 testing services now available for airport workers at reduced rates
August 5 – Terminal Garage Rooftop Parking Opens on August 9th
August 5 – Cessation of COVID-19 Temperature Screening at Toronto Pearson
July 26 – Closure of Taxiway Delta between Taxiway A and Taxiway DR
July 16 – MU3A Signage above the roll-up doors (EF1013F) (EF1013G) (EF1013J) (EF1013H)
July 13 – New passenger Departures testing centre open at Value Park Garage
July 9 – Employee Testing Study to Conclude on July 9, 2021
July 6 – Terminal 1 Aircraft Stopline Optimization
July 6 – Screening of Persons and Items at Non-Passenger Screening-Vehicle (NPS-V) Screening Checkpoints
June 29 – Reactivation of Gates in Terminals 1 and 3
June 24 – Access to T3 CBSA PIL
June 16 – Apron Code C Taxilane 11,12,13,14 Removal
May 31 – Application of larvicide for mosquito control at Toronto Pearson
May 21 – Taxiway Delta and Charlie between Taxiways Foxtrot and Echo Closure
May 12 – Taxiway Alpha between Taxiway Alpha-Delta and Taxiway Hotel Closure
May 5 – Taxiway Delta between Taxiway Foxtrot and Runway 06L
April 27 – Update to COVID-19 Testing for Airport Workers
April 23 – Update to Approved Aircraft Power Run Locations
April 13 – Operational Trial of Angled Mandatory Hold Positions for Runway 06L/24R on Taxiways D4 and D5
April 8 – Non-Passenger Screening - Vehicles
April 7 – Transportation Security Clearance Renewal and Return of Expired Security Items
March 25 – CUTE Training Room Closure
March 23 – Trial of Amended Preferential Runway System Extended
March 10 – New Passenger Flow Control Doors, Surrey Doors, and Employee Bypass- T1- Connections Corridor
March 3 – Volunteers needed for additional frequent testing study - Updated
March 3 – COVID-19 testing now available on-site as part of research study - Updated
February 25 – Garage level Closures Effective March 1
January 31 – COVID-19 Arrival Testing
January 14 – Province of Ontario to enter State of Emergency
January 6 – Access to T3 Domestic Baggage Hall
December 15 – Supporting Operational Effectiveness at GTAA Pass Permit Office
December 15 – B14 Ground Power Unit Replacement - Gate Restriction
December 14 – Infield Tunnel (West) Standpipe Supply Line Leak Repairs
December 9 – Amended Hours for the Logistics Center
December 9 – Rising Cases and Local COVID Guidance
December 7 – Automated People Mover (APM) Service Disruption
November 19 – Reactivation of GSE Towing Protocols
November 19 – Non-Passenger Screening – Vehicles (NPSV) Cargo West concrete patching
November 18 – Revised - Changes to the Critical Area at Infield Concourse (IFC)
November 13 – Changes to the Critical Area at Infield Concourse (IFC)
November 10 – Aircraft Holding to maintain physical distancing
November 9 – Parking Structure Roof Terminal 1 & 3 closed for Winter 2020/2021
November 9 – Update to Approved Aircraft Power Run Locations for Winter 2020-21 Season
November 6 – Pass Permit Control Office - Change in Hours of Operation
November 3 – Terminal 3 Elevators E4 and E5
October 29 – Effective January 1, 2021 - New Employee Parking Rates
October 27 – GTAA Logistics Program Update
October 22 – Non Passenger Screening-Vehicular (NPS-V) South – 1 Day Closure
October 19 – Renewing Expired Transportation Security Clearance and Restricted Area Identity Cards at the Pass Office
October 16 – Automated People Mover (APM) Service Disruption
October 16 – Terminal 3 Elevator H22
October 2 – Non-Passenger Temperature Screening Wristband Trial
October 1 – Automated People Mover (APM) Service Disruption
September 28 – Terminal 3 Elevator AP8
September 21 – Apron Entrance AK between Lane 5 and 6 - Hot Water Chamber Abandoning
September 11 – Outer Vehicle Corridor – Temporary Closure
September 10 – Airport Health Initiatives – T1 South Bridge Closure
September 3 – COVID-19 testing as part of Research Study
August 24 – Infield Tunnel (West) STANDPIPE SUPPLY LINE Leak Repairs
August 21 – AVOP Written Examinations – Sessions Added
August 19 – Terminal 1 Decommissioning FEM11 & FEM12
August 17 – Advanced Visual Docking Guidance System – Approach Error
August 11 – Revised T3 Head of Stand Road Closure at C29
July 31 – Terminal 1, Terminal 3 HSBC Rebranding
July 28 – Mandatory Temperature Screening
July 27 – T1 Pier F Hammerhead Service Road - One Way Traffic Flow
July 27 – T3 Head of Stand Road Closure at C29
July 23 – Terminal 1 East Pier D Crack Sealing
July 23 – Apron Taxilane 4 Slab Replacement – Terminal 3
July 21 – Terminal 1 Inbound baggage roadway use of U-turns in selected locations
July 15 – T3 Gate C36
July 6 – Airport Health Initiative - Non-compliance escalation
July 2 – Infield Tunnel East Portal Surface Repairs
June 17 – AVOP Testing and Expiration Dates
June 16 – Employee Bypass T1 at L3 International/Transborder
June 12 – Airport Health Initiatives
June 10 – Terminal 3 Elevator BH31
June 4 – Terminal 1 Elevator Refurbishment ECP03
May 22 – Temporary Suspension of Aircraft Power Runs at North Field Locations
May 22 – Taxiway Hotel Rehabilitation
May 22 – Runway 15L/33R Closure
May 22 – Advanced Visual Docking Guidance System (A-VDGS)
May 19 – Update to Apron Entrance AT Closure
May 14 – Apron Entrance AT Closure
May 14 – Taxiway Hotel between Taxiway Foxtrot and Taxiway Golf Closure
May 7 – Transparency with Toronto Pearson workers about COVID-19 cases
April 24 – Security within US Departure Area
April 23 – Flow of International Departing Passengers from Level 3 Domestic Screening to International E Gates
April 18 – Changes to Employee Access Operating Hours
April 18 – Changes to Airside Access
April 17 – Application of larvicide for mosquito control at Toronto Pearson
April 9 – Temporary changes to Transport Canada Security Screening Program at the Pass Permit Control Office
April 9 – Amended Runway Selection Criteria
April 6 – AVOP Renewal Procedures and New AVOP Applicants
April 6 – Terminal 3 Elevators AP9 and BH29
April 3 – Optimizing Toronto Pearson operations due to COVID-19
April 3 – Value Park Garage and Value Park Station South Lot closing temporarily
March 31 – NEW Skyservice (South) Fixed Based Operator Activation
March 30 – Closure of Infield Concourse (IFC)
March 25 – Closure of T1 Comfort Zone and the T3 Toronto Pearson Employee Lounge
March 19 – Update to AVOP Renewal Procedures
February 24 – Trial of Amended Preferential Runway System
February 21 – Terminal 3 Elevator BP27
February 19 – Terminal Access Roads
February 14 – Road Closure (Western Entrance to Terminal 1 HHF Baggage Road)
January 23 – Pier G Expansion - Gate Closures (264, 266, 268, 270)
January 23 – Pier G Expansion - Opening of Gate 245A
January 23 – Information on Novel Coronavirus (2019-nCov)
January 22 – Terminal 3 Gate C26 Geotechnical Borehole Drilling
January 22 – Pier C Baggage Tunnel Closure
January 14 – Terminal 1 door replacement FF3003B
January 14 – Temporary Closure of Vehicle Gate V315C
January 13 – Terminal 3 Elevator G14
December 19 – Crane and Aerial Device Permit Holiday Blackout Period
December 17 – Non-Passenger Screening of Vehicles (NPSV) – South and Controlled Egress Operation V315C
December 13 – Sunwing Winter 2019 Operations – Infield Concourse (IFC)
December 10 – Closing of FC3241A and FC3025
December 6 – Tie-In of TWY W to Skyservice South FBO Apron
December 4 – Terminal 1 APM Station Construction
December 1 – Gate Mix Change Procedure
November 6 – 12542 – Central Deicing Facility Glycol Tank 4 Project – Taxiway T
November 6 – Terminal 3 Elevator AH11
November 5 – Airside Activity Requests & Crane Requests
November 1 – New Temporary delivery loading area on Head of Stand at T3 between Gate C29 and C30
November 1 – 2020 Parking Tag Revalidation
October 22 – Area 16 PSL Construction
October 17 – Deicing Services Program Documentation
October 17 – T3 Arrivals Level – Relocation of Off Airport Parking Pickup Area
October 9 – Terminal 3 Elevators G18 and G19
October 8 – Construction work on Head of Stand at T3 between Gate C36 and C37
October 4 – 2019 EMS Changes 191001A
October 4 – Terminal 3 swing door replacement AH218A and AP229A
October 1 – Pier G, H Gates and New Taxilanes 11, 11E, 12, 13, 13E, 14
October 1 – Construction work at T3 between Gate C36 and C37
October 1 – Terminal 3 Escalators G14 and G15
September 16 – Terminal 3 Escalator H18 and H19
September 13 – Toronto Pearson Runway Run Closure and Restrictions
September 13 – Tow Coordination Frequency Change
September 12 – Addition of Mandatory Stop Lines for Vehicles Driving on the Apron
September 11 – Relocation of the fleet vehicle entrance at T1
September 6 – Terminal 3 Elevator BH28 Advisory
August 26 – Airside Storage Compound
August 21 – Entry into Force of Preclearance Act, 2016
August 19 – Changes to the Transportation Security Clearance Program for Preclearance Area
August 15 – Gate 193 East Apron Expansion
August 2 – Terminal 3 Elevator AH12
August 2 – East Apron Expansion – Phase 2
August 1 – Temporary Closure Vehicle Gate V315C
July 25 – Construction word on Head of Stand at T3 gate C29
July 24 – East Apron Expansion – Phase 1
July 22 – Temporary Closure of Terminal 1 International NPS-T
July 11 – RMU Phone Number Changes
June 18 – Repair of Culvert C198June 18 – Curb Modifications for Additional Ground Transportation Services
June 10 – 193 Extension Gate Lounge Re-numbering
June 5 – REVISED New Apron Paint Markings – Gates 161, 161A, 163, 165, 165A, new one-way connection road between Gate 157/161 and 163/165
May 22 – Trial of Summer Weekend Runway Alternation Program
May 13 – Highway 401/Renforth Drive & Highway 401/427 Bridge Rehabilitations
May 10 – Taxiway B Rehabilitation
April 25 – Glycol Tank 4 – Phase 2
March 28 – Earth Hour Advisory 2019
March 21 – NPS Closure Advisory
March 19 – Glycol Tank 4 PSL Fence Installation
February 26 – Parking reminder for airport employees
February 25 – Changes to Employee Egress from Terminal 1 International
February 18 – Amended runway Selection Criteria
February 15 – General Business Aviation Airport Reservation Office Reservations Trial procedures
February 12 – Airport Collaborative Decision Making (A-CDM) Trials Suspended
February 11 – Terminal 3 Transborder Gate Check Carry-down Process Change
January 28 – Pass Permit Control Office Walk-In Service Continues on an Interim Basis
January 18 – Completion of Air Canada Bay 8 Demolition Enabling Works
January 15 – Cargo West NPSv Work on Traffic Management System January 21-22
January 8 – T1 Domestic Gates reserved airside vehicle stalls
January 8 – Opening of New Terminal 1 CATSA Plus International PBS and NPS-T
January 8 – Closure of employee egress at V408C
January 4 – GTAA Logistics Centre Relocation
December 19 – Infield Concourse Activation
December 19 – T1 International NPS Relocation Advisory
December 18 – Britannia Road Watermain Replacement
December 17 – Activation of Restricted Area Temporary Pass System at GTAA Administration Building
December 12 – Airport Collaborative Decision Making (A-CDM) & Airport Reservation Office (ARO)
December 7 – Facility Control Measures and Evacuation Plan
December 7 – Air Canada Bay 8 Demolition Enabling Works
December 7 – Pass Permit Control Office Walk-In Service Trial
December 6 – Non Passenger Screening Vehicle South - Work on South Service Road
December 4 – Access to Transborder Areas in Terminals 1 and 3
November 29 – 12857 – East Apron Phase 1
November 29 – Air Canada Bay 8 Demolition Enabling Works – Phase 2 and 3
November 23 – NPSV-South – Work on South Service Road
November 19 – Airport Collaborative Decision Making (A-CDM) & Airport Reservation Office (ARO)
November 15 – Christmas Trees in all Airport Facilities
November 13 – Reinstatement of primary security line at Terminal 3 – H121A
November 8 – 12826 – Gate Modifications
November 2 – Air Canada Bay 8 Demolition Enabling Works – Phase 1
November 2 – REVISED – 11362 – Terminal 3 – Escalators H16/17 (CBSA Customs hall from the Pier C side of the AT level)
October 29 – Air Canada Bay 8 Demolition Enabling Works
October 28 – Restrictions on the wearing of Halloween costumes
October 26 – Cannabis Use
October 26 – 11362 – Terminal 3 – Escalators H16/17 (CBSA Customs hall from the Pier C side of the AT level)
October 23 – Temporary closure of entrance to Rainbow Road
October 19 – 12826 – Gate Modifications
October 18 – Temporary Pass System Updates (Phase 2) Advisory
October 17 – Revalidating Parking Permits for Cargo and GTAA Administration-AMF Parking
October 17 – East Apron Phase 1
September 27 – Changes to T1 Aisles 6-7 and Employee Access to INTL Sector
September 21 – Elevator H24 (passenger elevator to Pyramid level) and freight elevator G17 refurbishment – Terminal 3
September 20 – Correction – Changes to Employee Egress from T1 INTL-TB Sectors
September 19 – Changes to Employee Egress from Terminal 1 International and Transborder Sectors
September 17 – AJ and Apron Rehabilitation
September 17 – Subject: 12608 – Non-Passenger Vehicle Screening – Cargo West
September 10 – AJ and Apron Rehabilitation
August 30 – Lounge A83 Available
August 20 – Taxiway EB Code C and Smaller
August 10 – Non-Passenger Vehicle Screening – Cargo West
July 24 – Testing of Summer Weekend Runway Alternation Program
July 19 – Smoking Curbside
July 13 – REVISED – Gate 193 East Apron Expansion
July 11 – Gate 193 East Apron Expansion
July 9 – Silver Dart Drive Construction
June 11 – Pilot Launch of Transportation Network Companies (TNCs) / Ride Sharing Services – Uber & Lyft
June 4 – Ground Frequency 121.65 Unavailable Nightly 0001-0530L June 5-8, 2018
June 4 – REVISED – T1 International Hardstand Bus Bays
June 1 – Terminal 3 Roadway changes
May 31 – Critical Restricted Area Expansion with new NPSV Location
May 31 – Uninjured Passenger Area
May 30 – Infield Terminal Re-activation – Pilot Program
May 30 – New Swing Wall – Pier F Near Lounge F66-F67
May 29 – Transition – Baggage Cart Management and Maintenance Services
May 25 – Parking Restrictions and Enforcement at Terminal 3
May 25 – Domestic Bus Bay 18 – New Domestic Departures Gate D30
May 22 – Advanced Visual Display Guidance System (AVDGS)
May 18 – Head of Stand Road One Way Traffic Gates H1 to H6
May 11 – Terminal 3 Gate Re-numbering
May 7 – Moore's Creek Storm Water Management Facility Shutdown
May 4 – New Apron Paint Markings – Gate H1 to Gate H6 Redesign
April 30 – Commissionaire Great Lakes to Paladin Security Services – Effective May 1, 2018
April 26 – Terminal 3 Temporary Security Pass Issuance
April 25 – E2 Freight Elevator Access
April 24 – Temporary Closure Head of Stand Road by T3 C37
March 29 – Labelling of Airside Bus Bay at Terminal 3
March 26 – Non-Passenger Vehicle Screening – Cargo West
March 21 – Toronto Pearson Observing Earth Hour March 24, 8:30-9:30 p.m.
March 19 – Environmental Emergency Contingency Program
March 9 – Runways and Taxiways – Driver Safety Advisory
March 7 – Temporary Relocation – Uninjured Passenger Area
March 5 – Reminder: Terminal 3 Duty-Free – Cash and Carry Protocol
March 2 – Terminal One – International to International Connections Program – Non-Travelling Passenger Egress
February 28 – Infield Terminal (IFT) Reactivation – Construction
February 1 – Access to Transborder Areas in Terminals 1 and 3
January 25 – Air Carriers or Licensed Wheelchair Handlers Utilizing Taxi or Limo Services – Terminal 1
January 12 – 12608 – Non-Passenger Vehicle Screening – Cargo West
Notices
December 21 – Hours of Operation for the month of December – Amendment to Dec 24
December 13 – Pass Permit Control Office Updates
December 5 – December 2018 Hours of Operation
November 2 – 2018 National Take Our Kids to Work Day
October 17 – Airside Safety Week 2018